Malaysia Oversight

Work stopped at Sungai Rasau water supply project after breach

By MalaysianInsight in April 25, 2025 – Reading time 1 minute
Work stopped at Sungai Rasau water supply project after breach


ALL work at the construction site for the Sungai Rasau Water Supply Scheme (Stage 1) project, located at Taman Mas, Puchong, has been halted to evaluate the situation and implement additional safety protocols.

Gamuda Bhd, in a statement, said all parties at the construction site are working closely with local authorities and experts to investigate the cause of the incident and determine the appropriate course of action.

“Our top priority is the safety of our workers, the public, and the environment.

“We are grateful to report that no injuries were sustained by either our construction workers or the public,” said the statement.

The company said at 2pm on Saturday there was a collapse of the pond embankment resulting in the pond water entering the construction work front area.

“The water breach is entirely confined within the construction site,” it said. – September 8, 2024.





Source link

“倒安华”集会周六举行 警方宣布16条道路交通改道

“倒安华”集会周六举行 警方宣布16条道路交通改道

“倒安华”集会周六举行 警方宣布16条道路交通改道 Updated 58 minutes ago · Published on 25 Jul 2025 7:03PM · 0 Comments shares A Share this…

Key highlights of Budget 2025

Reinvigorating The Economy, Driving Reforms, And Prospering The RakyatCatch the 2025 Budget Tablingby Prime Minister and Finance Minister.InfographicsBelanjawan 2025fas fa-arrow-circle-right0Achievements0Focus0MeasuresBudget…
介入公正党党选? J-KOM斥指控无根据 | The Malaysian Insight

介入公正党党选? J-KOM斥指控无根据 | The Malaysian Insight

介入公正党党选? J-KOM斥指控无根据 Updated 8 hours ago · Published on 15 May 2025 9:06PM · 伊依斯迈尤索普指出,J-KOM所有职员均严格遵守既定规章,以专业且诚信的态度履行职责。(图:截取脸书) 社区通讯局(J-KOM)严正否认曾指示其职员在2025年人民公正党党内选举中,对特定领袖的竞选活动进行“点赞”、“分享”或“宣传”等操作。 社区通讯局总监伊依斯迈尤索普公开声明,有关该局与公正党选举存在关联的指控“毫无依据”。 他今天在面子书发帖文说:“J-KOM所有职员均严格遵守既定规章,以专业且诚信的态度履行职责。” “我在此强烈否认任何关于J-KOM参与领袖竞选活动,或被利用攻击特定领袖的指控。” 伊依斯迈尤索普曾任公正党上议员,他强调,作为通讯部下属的政府机构,J-KOM始终致力于提供准确、公正且平衡的信息,以巩固国家的民主体制与社会稳定。…
Human activity, soil erosion caused KL sinkhole, says govt

Human activity, soil erosion caused KL sinkhole, says govt

HUMAN activity and soil erosion were among the primary factors responsible for the 8m-deep sinkhole that appeared on Jalan Masjid…
Raub durian farmers hope to meet PM soon

Raub durian farmers hope to meet PM soon

DURIAN farmers in Raub, Pahang, are seeking a meeting with Prime Minister Anwar Ibrahim to address claims of oppression by…